Estimate the quantity of soil to be excavated from the borrow pit​

Respuesta :

lola2487
lola2487 lola2487
  • 04-08-2019

Answer

1056

Explanation:

for example

A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate

Quantity of soil to be excavated from pit in m3

Answer Link

Otras preguntas

Plz help meeeeeeeeeeee
A chemist makes a solution of acetic acid. The chemist makes at least 2 liters and wants to store the solution in several smaller jars. One jar holds 0.5 liter,
I need help with pre-cal and understanding how to simplify this trig expression with identities.
What factors determine the climate of an area ​
What are the scientific names for bacteria shapes?A) Sphere B) RodC) Spiral​
Which of the following option contains the correct value for x in the following equation : 2560 MB = (x) KB
Predict the change in the graph from f(x) to g(x). Then graph both lines to check your prediction. 1. f(x)= x; g(x)=x+5
What’s we’re u boats
What are the three main ideas in the cell theory
Help please! Elaborate on question 3 this is due today and I'm stuck