Instability of user capability needs, design, and production processes are most likley to cause:_________-

Respuesta :

ranijoshijj97 ranijoshijj97
  • 09-01-2020

Answer:

Cost increase and Schedule Slips

Explanation:

Schedule slips is the act of missing the deadline of the project and in order to avoid the schedule slips, person should plan their projects carefully so that could avoid the delays the schedule.

Instability, states it lacks the stability in the capability design, production processes and needs of the project, so, if the users lacks in the following areas, which in turn result in the increase in the cost of the project as well as the schedule slips.

Answer Link

Otras preguntas

Aqueous solutions of this ion give a reddish precipitate when excess hydroxide ion is added. (A) Cu^{2+} (B) CO₃^{2−} (C) Fe^{3+} (D) Al^{3+} (E) Pb^{2+}
deer : woods : : monkey :
How do figure out 120/f = 1.2?
What kinds of activities made up the early economies of the North American colonies?
How many cups are in 1 gallon of water
what did the Muslims gain from the crusaders ?
You begin solving the equation 4 – 5x = 59 by subtracting 4 from both sides. Which is the best choice for Step 2?
Why does a bike get heavier when it rusts???Very confussed, I cant find anything on the internet :( please help
Compare and contrast an electromagnet and a permanent magnet.
The volume of a cylinder with height to radius ratio of 4:1 is 108 pie centimeters cubed. Find the radius and height of the cylinder.