Mixedemotions1150 Mixedemotions1150
  • 04-03-2020
  • Computers and Technology
contestada

A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

Kala added a spoon of yeast and hot boiling water to knead bread dough, whereas Rupa added warm water to knead the dough with yeast in it. Both of them made bre
find the sum of 9 and 20 on number line
on which four factors does the quantity of heat lost or gained by body depend? ​
An angle of 200° is a/an angle.
When historians ask questions about variations across different groups of people with common transitions, they gather information from___​
What was the advantage of paved roads?
Um avião partiu de um aeroporto situado a 800 metros acima do nível do mar, com o tempo bem e a temperatura de 32° C. Ao atingir a altitude máxima, de 3 100 met
y=(x+9)÷(x-3)Find the value of y when x=5​
A train ticket to the city centre costs £2.85. A teacher buys 26 of these tickets for a school group. What is the total cost of 26 tickets?
Russia has recently started a push for stronger smoking regulations much like those in Western countries concerning cigarette advertising, smoking in public pla