jeevenjoji2007
jeevenjoji2007 jeevenjoji2007
  • 01-09-2020
  • Mathematics
contestada

if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

A Canadian driving from Quebec to Montreal finds he has traveled 271 km. How many miles is this? There are 1.61 km in 1 mi
In the figure below, if angle T measures 130 degrees, what is the measure of angle Q?
You are in downtown Chicago (where streets run N-S and E-W). You started from 600 N. Michigan Avenue, and walked 3 blocks toward north, 4 blocks toward west, an
Which window control button appears only when a window is maximized? () Maximize Minimize Restore Close
Suppose a restaurant sells soft tacos, crunchy tacos, hamburgers with cheese, hamburgers without cheese, and fried chicken. Your coverage criterion says to tast
point) Suppose that the trace of a 2 x 2 matrix A is tr(A)= -9 and the determinant is det(A) 18. Find the eigenvalues of A. The eigenvalues of A are (Enter your
A water wave of wavelength 859 cm travels a distance of 64 m in a time of 14 s. What is the period of the wave, in units of seconds?
The Supply/Demand equilibrium price is __________ with an equilibrium quantity of _________. PRICE Column 1 Quantity Column 2 Quantity $5 11 92 $6 36 68 $7 50 5
What is helping to improve the conditions of the poor in Brazil?
1. A 20 kg object is thrown with an initial upward velocity of 2 m/s. If air resists motion of the object by 4 N for each m/s, what is the terminal velocity of