What is the preferred approach to risk mitigation?

-Tolerate
-Transfer
-Terminate
-Treat

Respuesta :

oeerivona oeerivona
  • 08-01-2021

Answer:

The correct option is;

Terminate

Explanation:

Termination of the risk is equivalent to elimination of the risk by avoiding the activity that brings about the risk or by using a different process that does not include the risk observed in the previous process option

When the reward far outweigh the risk, it may be decided to terminate or eliminate the risk and miss the reward and also terminate the likelihood of the losses to be incurred.

Answer Link

Otras preguntas

Round 99.49 to the nearest whole number
which feature of the United states constitution was included to address the concern expressed by James madison
A lecture was being given to the students A.verb B.noun C.adj
In the South Pacific Marines used coded messages sent in the _____ language.
sharonas age is at most 3 more than twice kaylas age. if sharona is 35 years old, write an inequality that best represents the situation, where a represents kay
Which word should not be hyphenated to fit on a line? A. charge B. automatic C. divided D. register
What is the term used for a play that is performed exactly as it is written? adapted direct translation indirect translation
10 exponent negative 9 divided by 10 exponent negative 3
Which verb is in the present perfect progressive form? A. has been sleeping B. are listening C. shall have been growing D. had been joking
Which outcome resulted from the period of Prohibition in the United States?