arbolducbooks8602 arbolducbooks8602
  • 04-01-2021
  • Computers and Technology
contestada

What technique is used when setup times at a workstation are sequence dependent?

Respuesta :

littleliax0618
littleliax0618 littleliax0618
  • 04-01-2021

Answer:

johnsons rule minimizes total idle time for both machines or work centers. What technique is used when setup times at a workstation are sequence dependent? determine the total time of each job sequence permutation considering the setup time and choose the best (lowest) time.

Explanation:

please mark me as brainliest thank you

Answer Link

Otras preguntas

what is the area of a rectangle of 5/9 m in length and 7/8 m in width
Which term includes all of the interactions between the organisms and physical factors in a pond? * a. Population b. Ecosystem c. Abiotic d. Competition
Karla discovered that she could create the perfect shaped heart by combining two semicirlcles and a square what is the area of he heart karla created
2.Write the Simple past of these verbs 1. Enjoy 2. Phone 3. Plan 4. Stay 5. Fry 6. Arrive 7. Organise 8. Close 9. Invite 10. Rain 11. Shop 12. Visit
1. What is the ratio of smileys to hearts in fraction form?O5:12O5:7O7:5o 7:12​
Aeg = 10 solve for g
A sample compound with a molar mass of 34.00g/mol is found to consist of 0.44g H and 6.92g O. Calculate both empirical and molecular formulas.
which of these are benefits of physical therapy? check all that apply-more range of motions in joints-better eyesight-more-flexible muscles-stronger muscles-bet
Find the missing side. Round to the nearest tenth.
can someone please help me with this i will give brainliest