medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Which statement best describes how the energy stored in ATP is released to drive biochemical reactions? a. Energy is released when the ribose sugar reacts with
What is a way a cell is put together called?
What is a way a cell is put together called?
A Coast Guard ship patrols an area of 125 square miles. The area the ship patrols is a square. About how long is each side of the square? Round your answer to t
what forces led Americans to declare war on Britain in 1812?
If x=3 and y=-2 and z=4, what is the value of 3x + 2y - z?
To calculate the area of the front surface of a box,you (a) add the length to the height (b) add twice the length to twice the height ( c) multiply the length b
write the ratio 6 ft to 4yd as a fraction in simplest form.
What Percent Of 700 Is 385
make a short dialogue about the introduction!