kanika07bts
kanika07bts kanika07bts
  • 01-03-2021
  • Mathematics
contestada

if 5 workers can build 5 cars in 5 days how many days would it take for 7 workers to build 7 cars

Respuesta :

1uk846 1uk846
  • 01-03-2021

Answer:

7 days

Step-by-step explanation:

It would also take 7 days

Answer Link

Otras preguntas

Two bottles of body shampoo cost RM23.60. Calculate the cost for 6 bottles of the body​
evaluate the function f ( -2) = − 3 ^2
Most reactions, including enzyme-catalyzed reactions, proceed faster at higher temperatures. However, for a given enzyme, the rate drops off abruptly at a certa
suggest a way to conserve soil
Write the standard form of the equation of the circle with center (8,−1) that passes through the point (6,7)
Simplify the expression using trigonometric identities: sec (–θ) – cos θ.
3/4 of the class walk to school while 1/5 ride bicycle. Find the ratio of those who walk to those who ride bicycles.
According to the graph, in what year were there two million farms? 1995 1960 1980 1975
Meaning of power in physics
If θ is an angle in standard position and its terminal side passes through the point (7,-4), find the exact value of sec⁡θsecθ in simplest radical form.