kyn30 kyn30
  • 02-04-2021
  • Mathematics
contestada

mark wants to build a concrete patio that will be 9 yards by 11 yards . it will cost $4.00 per square yard to build . what will be the cost of the patio

Respuesta :

akovacs3703 akovacs3703
  • 02-04-2021
396, Explanation: 9x11=99 99x4=396
Answer Link
brigidau
brigidau brigidau
  • 02-04-2021
$396
9 * 11 = 99
99 * 4 = 396
Answer Link

Otras preguntas

This is the income you receive after all the deductions have been taken from your paycheck
what is the purpose of filters in a data base
the area of the rug is 36 1/4 square feet the rug is 8 3/4. what is the length of the rug?
The Constitution was drafted in 1787, after the American Revolution ended. What document preceded the Constitution in outlining the powers of the US government?
what is equivalent to 72 inches
Why did American Indians trade with others? What was the main reason that Europeans traded?
What is 17/100 simplest form?
How did the early West cause a cultural transformation in the United States?
The three important reasons for studying history are _____.
What are the three theories for the emergence of Homo sapiens?