ronieshabrown13
ronieshabrown13 ronieshabrown13
  • 02-12-2021
  • Mathematics
contestada

a contactor hired 150 men to pave a road in 30 days.how many mem will be hire to do the same work in 20 days​

Respuesta :

kevinmario2008 kevinmario2008
  • 05-12-2021

Answer:375

Step-by-step explanation:W = RTN

1 = 1/7500(20)N

1 = 20/7500N

1 = 2/750N

750(1 = 2/750N)

750 = 2N

750/2 = N

375 = N

There are 375 men to do the job in 20 days

Answer Link

Otras preguntas

Find Domain of the functionsquare root of (x-8)/x(x-9)
Which equation has the same y-intercept as y=4x-3?a. y-3=x              b. y=8x+3    c. 3-y=4x      d. y=-3+8xWhich of the following is the equation of the line
Which equation has the same y-intercept as y=4x-3?a. y-3=x              b. y=8x+3    c. 3-y=4x      d. y=-3+8xWhich of the following is the equation of the line
(10y^3+20y^2+55y)/5y
what is the answer for (20,8),(9,16) ?
how is mass transit in cities a possible solution tk urban air pollution?
How is it possible for Mercury to have frozen ice ?
Prove that (x^5)-(x^2)+2x +3=0 has at least one real root. Prove that x=cosx has at least one solution.
(10y^3+20y^2+55y)/5y
Find Domain of the functionsquare root of (x-8)/x(x-9)