A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

If the probability of giving birth to a boy is 0.52, what is the approximate probability of giving birth to 4 consecutive boys?
What's the answer to this problem?
Why do we use granite?
The tickets for the concert are selling for $12.00. Juanita is going to the concert with a group of 25 people. There is a discount of 1/8 off each ticket for gr
Which sentence correctly forms the plural of the letter R? A. Three R's make up her initials.
Patrick ate 3/5 of a small pizza on Friday night. For lunch on Saturday , he ate 1/2 of the leftover pizza. How much pizza did he eat for lunch on Saturday?
if the score is 90% and the total is 70 what is the number correct ?
who decided the election of 1800 and why ?
Nick bought a video game for $55, which was 20% off the original price. what was the original price?
The tickets for the concert are selling for $12.00. Juanita is going to the concert with a group of 25 people. There is a discount of 1/8 off each ticket for gr