An experienced carpenter could build a house in 5 days. How much would he have finished if he worked for 3 days?

Respuesta :

MIniNAchoz
MIniNAchoz MIniNAchoz
  • 01-03-2017
I think it would most likely be  3/5
Answer Link
snoopynfriends
snoopynfriends snoopynfriends
  • 01-03-2017
he would have 8 this is the answer
Answer Link

Otras preguntas

If (x - 2) and (x + 1) are factors ofx + px? + qx + 1, what is the sum of p and q?​
Examine the following diagram. Place the labeled layers in order from youngest to oldest. Public Domain A, B, C, D C, D, B, A D, A, B, C C, B, A, D
scott can deliver 10 pizzas per hour and kenneth can deliver 12 per hour how mnay hours will it take them to deliver 110 pixzas
Explain four roles of the South African media with regard to gender based violence (6)
the overall take away of an experiment’s results is the______. A. hypothesis B. introduction C. conclusion
Use the References to access important values if needed for this question. For the following reaction, 3.83 grams of hydrogen gas are allowed to react with 9.60
measures that can be taken to increase equilibrium level of income.​
EarthShapers Inc., a manufacturer of heavy construction equipments based in U.S.A., maintains large sales and support operations overseas. Before sending new em
You plan to take your hair blower to Europe, where the electrical outlets put out 240 V instead of the 120 V seen in the United States. The blower puts out 1700
Solve for x. 3(x + 2) = 12 x=2 x=33 x=4 2/3 x=6