keeya12 keeya12
  • 03-12-2015
  • Mathematics
contestada

If you work 8 hours per day, how long would it take you to build 10 doghouses?

Respuesta :

meerkat18
meerkat18 meerkat18
  • 26-09-2016
The question is asking to state the duration that would it take you to build 10 doghouse if you work 8 hours per day, base on my research and further analysis, I would say that the answer would be 60 hours, because 6 hours is one dog house. I hope you are satisfied with my answer and feel free to ask for more 
Answer Link

Otras preguntas

Explain why chemical weathering occurs faster in hot, wet climates than in cool, dry climates.
pros and cons of the inter's ability to access information
what are the sides lengths of the rectangle perimeter 40in
Explain why chemical weathering occurs faster in hot, wet climates than in cool, dry climates.
Jon ran around a track that was 1/8 of a mile long, He ran around the track 24 times. How many miles did Jan run in all
which word could be used to describe 4x in the expression 4x+7
Write the phrase as an expression: 5 less than 8
completing the square v^2 + 4v - 22= 10
The word ecology is made up of two Greek words, oikos and logia, and means "_____." house knowledge life logic house logistics environmental knowledge
True or False: Power is the ability to control the behavior of other with or without their consent.