cristianmart29 cristianmart29
  • 04-04-2018
  • Computers and Technology
contestada

What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

What is considered a preexisting condition?
Predict the formula for a compound made from X3 and Y2–.
Complete the graphic organizer to show the relationships among heat, movement, and density in the mantle rock.
An equation for estimating the speed of a tsunami is s=3.1√d where d is the depth of the ocean in meters and s is the speed in meters per second. Find the depth
what's 37 times 26 show your work
Which method is appropriate for separating a mixture of iron and aluminum
students often pick on Tito, but he says that this is a sign that the other students like him. What defense mechanism is Tito displaying?
Need help on 12 13 14
What does succession mean and why was it important in England in this period?
What Supreme Court case established the validity of implied powers? A. Marbury v. Madison B. McCulloch v. Maryland C. Plessey v. Ferguson D. Miranda v. Ar